The Orezone Bomboré Project necessitated a robust review of its Environmental and Social (E&S) requirements. As the resource personnel, supported by the ALG expertise, a focused and systematic technical approach was implemented to ensure comprehensive E&S compliance and mitigate potential risks.
Our methodology, conducted during April-May 2022, was structured around five key technical objectives:
- Comprehensive Section Review and E&S Issue Identification:
The initial phase involved a detailed technical review of all project sections. The aim was to systematically identify and document all existing and potential environmental and social issues pertinent to the Bomboré Project’s scope and location in Burkina Faso. This involved cross-referencing project plans with established E&S standards.
- Technical Assessment of Issues, Risks, and Impacts:
Following identification, a technical assessment was performed to evaluate the significance of the issues, risks, and potential E&S impacts directly associated with the planned operational activities. This phase utilized established risk assessment matrices and impact evaluation methodologies to categorize and prioritize potential harm to the environment and local communities.
- Informing E&S Selection Documentation:
A critical step involved translating the findings into practical documentation. We were responsible for accurately populating the required technical sheets and forms used for the environmental and social selection (screening) of sub-projects. This ensured that all subsequent project components would be evaluated based on the identified E&S risks.
- Technical Engagement with Local Authorities:
Effective E&S management requires local coordination. We engaged in direct technical consultation and exchange with the technical departments within the town halls of the sites hosting the project sections. This dialogue was crucial for aligning project activities with local environmental regulations and social concerns, ensuring stakeholder buy-in, and gathering site-specific technical data.
- Validation, Classification, and Work Determination:
The final phase involved the validation of the screening results. This led to the formal E&S classification of the project components. Based on this classification, the necessary environmental and social work—the technical mitigation and enhancement measures—was determined. The ultimate goal of this entire approach was the preservation of the tranquility and well-being of the neighboring and adjoining populations throughout the project lifecycle.
This systematic and technically driven approach was instrumental in providing Orezone with a clear, compliant, and responsible pathway forward for the Bomboré Project.